Project cost: Rs 11,370mn. State: Karnataka. Length: 45.012km
Four Laning of Sannur to Bikarnakette section from Existing Km 698.850(Design Km 691+850) to Existing Km 744.190 (Design Km 736+362) of NH-169 under Bharatmala Pariyojna ofn Hybrid Annuity Mode in the State of Karnataka (Package-III)